Port of Hood River Bridge - Two Full Closures on Monday, October 18

Due to the traffic backups caused by testing activities on Wednesday, October 18, the testing schedule has been altered to eliminate one full day of testing closures and minimize traffic backups.

The bridge will be fully closed to all traffic twice on Monday, October 18 for a one-hour period each closure. The first closure will occur at 10:00 a.m. to 11:00 a.m. and the second will take place at 2:00 p.m to 3:00 p.m.

During both hour-long closures, access to the bridge will be closed at the signaled intersection of OR Highway 30 and E. Marina Drive in Oregon and at the Washington SR14 bridge onramp just west of Bingen, Washington. Access will be provided for emergency vehicles conducting emergency response or transport.

There will be no full closures scheduled for Wednesday, October 20.

For more information, contact the Port of Hood River via email at porthr@gorge.net.